2025 3/2 Senior Center
The earth-break wall of our senior center in El Salvador was finally completed today. The upper cement wall was built by volunteers, and the lower earth-break wall was completed by engineers from the municipal government. Only one mangrove was left. From the opposite side, it was a very large project. Thanks to everyone’s support, we finally see the results today.
2025 2/17 Senior Center
Senior center project for retaining wall
All the churches members join to do the upper top of the concrete wall with joys
2025 2/10 Senior Center
The construction of the upper earth-prevention wall of our senior center is being continued by volunteers from the church. The part below by the city government engineers has been completed.
2025 2/2 Senior Center
The retaining wall was completed by engineers from the municipal government. To thank them, we gave them motorcycle hats and a sumptuous Chinese meal. Because the works near the river were dangerous, the municipal government stipulated that their professional engineers should do the construction. Finally, the work was completed.
The lower part of the retaining wall of our senior center in El Salvador has been completed, and now the upper part is being worked on. This project was completed by volunteers from the church.